Nowadays, China is one of the
plastic mould production countries in the world, foreign customers to purchase
the quantity of plastic mould from China is continue to increase. But when you
purchase the plastic mould China, consider
how to choose the best supplier in so many companies?
There are some points must be pay
attention to:
·
The
strength of the factory. How many
workshops and how many sets of import tooling machines from advanced country?
for example: sodick precision EDM, sodick precision Wire cutting machines,
fidia 5 axis milling center, fidia 3 axis
high speed CNC, Deep hole drilling machines and how big of the injection
machine for mould testing?
·
The
components of the department, do they have the R & D department? How many design department and sales
department? Also tooling department,
Quality control department and processing control department.
·
Do
know about the company’s culture, the management system and core philosophy, good
company it will take their responsibility as one’s recognition, sensibility and
belief toward oneself, others, family, society and the self-conscious attitude
of related regulation abiding. For example, SINO MOULD Company’s core
philosophy is Responsibility, every one work in SINO which has the top
responsibility concept for our customer. As SINO people, we should keep the
“responsibility” in mind; upgrade self-value, work together to make
contribution to the society.
·
Team-work
spirit, from the sales department – design department- tooling department-
testing department- quality control department-ship department, so much work
flow that must be a good and strict cooperation team, therefore, we have the
confident to deliver the moulds to our clients in time.
·
Mould
steel chooses each mould has the best cavity and core steel, neck screw steel
and mould base. For example the PET perform mould, Sino Mould Company will use the
Stavax S136 stainless steel for the cavity and core.
·
New
technical improvement, SINO technical and experience is constantly enrich, we
have the rich experience for some high challenge moulds, for example, we made
the high speed 4 cavities crate mould in 2006, it is the first 4 cavities crate
mould successful made in the world. In Mould Labeling solution in 2008, the
whole syringe line in 2009 and etc.
·
Certainly,
the most important point is for every detail of the process control, we are
from the different countries, it must put integrity first, because customers
can not supervise every tooling process, but SINO MOULD will send buyer the
mould tooling schedule and processing report with tooling pictures each 10
days. We will send the tryout samples for buyer checking and work out
improvements requirement. before the delivery, SINO quality control department
will made the strictly inspection, after we got the agreement for the testing
sample from the customer, and then only get the inspection certificate from
engineering department that the moulds can arrange the shipment, also we will
send the mould operation instruction and some spare parts with moulds for shipping. Whether
every process that cannot be ignores.
·
After-sales
service, it is very important for plastic molds China. But for SINO MOULD is
very easy to realize, we will offer 24 hours repairing service, offer one year’s
guarantee for whole machines, and also offer machine upgrading service.
Finally, the plastic mould can
extensive used that due to the plastic mould can meet and solve the different
needs, plastic mould China that we have the high level of mould rapid
development, certainly, we can make the moulds as the DME & Hasco standard,
if there is a chance, welcome to China to make a down visiting for us, we are
sure that you must be very impressed and satisfied for us!